Specialists in the design, manufacture and installation of larger bespoke fixed and portable vacuum
Refer a friend
Receive a £25 gift voucher for every successful referral. (conditions apply).


Situation:
Cleaning time between batch runs accounts for the majority of machine down time.
Solution:
Cleaning time has been reduced from 90 minutes to 20 minutes.
![]() |
Heavy Duty wear resistant & anti-static hoses used to collect aluminium chippings from robotic fettling enclosure Minimises the heavy manual labour - Speeds up the cleaning process and significantly reduces down time. |
Waste material automatically removed from the point of cleaning to the skip removing secondary handling thus reducing workload |
|
Note:
- Skip is located in ‘parking bay’ which ensures easy access for forklift concerning emptying the skip easing bulk handling issues
- Viewing hatch allows quick inspection of contents level
- Bauer, quick release connections fitted to skip
![]() |
![]() |
![]() |
![]() |
![]() |







